Design For Testability

A simple answer is DFT is a technique, which facilitates a design to become testable after production. It’s the extra logic which we put in the normal design, during the design process, which helps its post-production testing. Post-production testing is necessary because, the process of manufacturing is not 100% error free.

key features

 
  • JTAG & IJTAG
  • Embedded deterministic test
  • OCC
  • Steaming scan network
  • Built in self test
  • SCAN stitching 
  • ATPG
  • Gate level simulations 

 

  • Mode of the training : Online | Offline classroom | 1:1| Weekend
  • Projects: 2 months
  • Theory and labs : 6 Months 
  • Internship: 6 months
  • Support with resume update 
  • Mock interviews
  • 100 % placement assistance

                                                                Have any questions? Contact: +918788083776 | mail : [email protected]